Hi,
for all of you who are eager to get news about the next major release of RapidMiner, we have a little surpise:
a first screenshot of the current state of the new graph based process design of RapidMiner 5.0. In the next version of RapidMiner, it will be possible to use a data flow design like that known from Clementine
as well as the operator tree based design known from previous versions of RapidMiner. Here is a small glimpse:

Please note that this is not the final look of the data flow visualization but you should at least get the feeling what will be possible with RapidMiner 5.0. And as you can see, keeping both options (the tree as well as the flow) fills the gap between the efficiency of the operator tree (drawing all those arrows takes soooo much time

) and the easiness of a flow / graph based layout when it comes to visualizing and understanding the data flows.
From time to time we will reveal some details about RapidMiner 5 so please stay tuned and let us know what you think.
Cheers,
Ingo